Batteries and the Gulf: Storage, Lithium and the Post-Oil Grid

Cheap batteries let Gulf solar supply electricity after sunset. This explainer covers the region's largest storage projects, who makes the cells, and where lithium and manufacturing plans stand.
By Energy & ClimatePublished Updated 6 min read

In brief

Batteries matter to the Gulf because they let solar power, which is cheap in the region but available only in daylight, supply electricity around the clock. Abu Dhabi is building a 5.2 gigawatt solar plant with 19 gigawatt-hours of batteries, and Saudi Arabia and Morocco want a place in the supply chain. Today, though, China dominates cell manufacturing and the Gulf’s role is mainly as a buyer and investor.

Why do batteries matter for an oil region?

Gulf countries use a great deal of electricity, mostly for air conditioning, and for decades they produced it by burning gas, oil or fuel oil. Solar auctions in Abu Dhabi, Dubai and Saudi Arabia have since delivered some of the lowest prices for electricity recorded anywhere, but the sun sets just as the evening peak begins. Storage closes that gap. Without it, a grid can only absorb as much solar as its daytime demand allows. The wider solar story is told in the Gulf’s solar boom.

A second reason is vehicles. If electric cars displace petrol and diesel, they reduce long-term demand for the product the region sells. Gulf governments are therefore both a threat and a market: they export fuel and are also building charging networks and investing in electric vehicle makers.

How much cheaper have batteries become?

BloombergNEF’s annual survey, published in December 2025, found lithium-ion battery pack prices fell to a record low of $108 per kilowatt-hour in 2025, down 8 percent from 2024 and about 93 percent below 2010. Packs for stationary storage were the cheapest segment at about $70 per kilowatt-hour. Prices fell mainly through scale, factory overcapacity, better chemistry and more efficient factories in China. Lithium iron phosphate (LFP) cells, which use no nickel or cobalt, are now the standard choice for grid storage and many cheaper cars because they are cheaper and tolerate heat well, a real advantage in a region where outdoor temperatures routinely pass 45 degrees Celsius.

IndicatorDateFigure
Average lithium-ion pack price2023, 2024, 2025About $139, $115 and $108 per kWh (BloombergNEF; later restated in real terms)
Stationary storage pack price2025About $70 per kWh
Turnkey battery storage system price2025About $117 per kWh (BloombergNEF)
Masdar and EWEC round-the-clock project (Abu Dhabi)Financial close July 20265.2 GW solar, 19 GWh batteries, $6.1 billion, 1 GW of continuous supply, operation targeted for 2027
Red Sea Global off-grid system (Saudi Arabia)Operating from about 2023About 400 MW of solar with roughly 1.3 GWh of storage
Gotion cell factory, Kenitra (Morocco)Commissioning began late October 2026Designed for 20 GWh a year; about $1.3 billion first phase

Source: BloombergNEF, Battery Price Survey and Energy Storage System Cost Survey, December 2025; Masdar announcement of financial close, July 2026; Red Sea Global project information; Gotion statements reported by Moroccan media, October 2026.

What are the Gulf’s biggest storage projects?

Several projects are among the largest anywhere, though capacity figures are announced targets in some cases and operating assets in others. The Abu Dhabi project, developed by Masdar with the Emirates Water and Electricity Company (EWEC), was announced in January 2025, broke ground in October 2025 and reached financial close in July 2026 with $5.1 billion of bank debt and $1 billion of equity, according to Masdar. It is designed to deliver 1 gigawatt of steady power 24 hours a day. A smaller, older benchmark is the sodium-sulfur battery plant at Abu Dhabi, about 108 MW and 648 MWh, commissioned around 2019.

Saudi Arabia has also tendered large battery systems alongside new solar plants as part of its target of 50 percent renewable electricity by 2030. The same logic drives plans for hydrogen, covered in green hydrogen in the Gulf, though batteries are far cheaper for storing power for a few hours.

Can the Gulf make batteries or mine the metals?

Only in part so far. The International Energy Agency has estimated that China makes about 85 percent of the world’s battery cells and processes most of its lithium, graphite and cobalt. Saudi Arabia says it holds large untapped mineral resources and has set up mining policy and exploration licences to develop them, but its lithium work is at an early stage and no large-scale production exists yet.

Morocco is the more concrete case. It holds the world’s largest phosphate reserves, the raw material for LFP cathodes, and its Kenitra and Tangier industrial zones have drawn Chinese manufacturers. Gotion High-Tech began commissioning equipment at its Kenitra factory in late October 2026, after the start slipped from an earlier target, and Volkswagen’s PowerCo and Gotion announced a cathode materials joint venture there in September 2026. Commissioning is not the same as full production, and the plant’s ramp-up is still to be proven.

The kingdom’s investment fund also owns most of Lucid, the American electric-car company, which assembles vehicles at a factory in King Abdullah Economic City. Output has been modest compared with the plans announced, and the company has relied on funding from the fund to continue growing. Supporters see a route to local industry; sceptics note the heavy subsidy and the small sales volumes.

What are the limits and risks?

Battery storage is good for hours, not seasons. A system with a few hours of capacity can move midday solar into the evening, but it cannot cover long periods of low output, so gas plants remain on the grid for backup. Batteries also lose capacity faster in high heat, which means cooling and careful management add to cost. Recycling and fire safety are further concerns, as large lithium-ion installations have had thermal runaway incidents elsewhere.

There is a supply-chain risk too. Dependence on a single country for cells would replace one concentrated dependency with another, which is one reason Gulf funds are buying stakes in processing and manufacturing abroad. Readers following the grid side of this should see extreme heat in Gulf cities, because cooling demand is the load these systems are built to serve.

Our analysis: storage is now an energy-security asset, not only a climate one

Gulf battery projects were first presented as a way to burn less gas and meet climate targets. The 2026 conflict added a second argument. Iranian drone attacks damaged a Kuwaiti power and desalination plant in March 2026, according to Al Jazeera, and shipping disruption at Hormuz affected fuel and gas flows across the region. A grid that can store solar output has a source of power that does not depend on a fuel delivery or a shipping lane, and the same batteries can respond within milliseconds when a plant trips offline.

The cross-country comparison shows different strategies. The UAE concentrates on utility-scale storage tied to a single large buyer, EWEC, and to data-centre demand. Saudi Arabia pursues storage, mining and electric vehicles together, with larger ambitions and less proven delivery. Morocco has the least oil but the strongest raw-material position and a manufacturing hub that sells into Europe. Each has a different binding constraint: offtake in Abu Dhabi, licences and technology in Saudi Arabia, and financing and customers in Morocco.

The limit is that storage solves hours, not weeks. The strategic value of batteries depends on how far they replace gas peaking plants, which is a matter for each grid operator’s design, not for press announcements. The sensible reading is that storage lowers exposure to fuel and price shocks without removing it, and that the largest benefits arrive only if cells and minerals are not sourced from a single supplier.

What does storage mean for ordinary electricity users?

For households and businesses in the Gulf, the effect is indirect. Electricity prices are set by governments and, in most states, remain subsidised for citizens, so cheaper generation shows up mainly in lower costs for utilities and in less fuel burned. Storage also makes grids more stable. Dubai’s utility DEWA, which runs the Mohammed bin Rashid Al Maktoum Solar Park, has said it plans to add storage to the park, and Kuwait and Oman have started to plan their own battery tenders. These are early steps compared with the scale of annual cooling demand, which can double a grid’s load between winter and August.

What to watch

Three signs will show whether the revolution is real in the Gulf: whether the Abu Dhabi round-the-clock project delivers on its 2027 target, whether Saudi lithium and mining licences produce a working mine, and whether the Kenitra factory reaches full output. Falling battery prices will continue to help the first; the second and third depend on investment, technology partners and customers that have yet to be secured.

Sources
  1. BloombergNEF, Lithium-Ion Battery Price Survey, December 2025
  2. BloombergNEF, Energy Storage System Cost Survey, December 2025
  3. International Energy Agency, Batteries and Secure Energy Transitions, 2024
  4. International Energy Agency, Global EV Outlook, 2024
  5. Masdar and Emirates Water and Electricity Company, announcements on the 5.2 GW solar and 19 GWh battery project, January 2025, October 2025 and July 2026
  6. Red Sea Global, project information on its solar and storage system, 2023
  7. Gotion Power Morocco, statements on Kenitra gigafactory commissioning, October 2026, as reported by Moroccan media
  8. Saudi Ministry of Industry and Mineral Resources, Future Minerals Forum materials, 2024

Ahmer Bilal

Ahmer Bilal runs The Arabians. He writes and updates every piece on the site, checks figures against official statistics, central-bank and IMF data, and answers reader corrections. His focus is turning the politics and economics of the Gulf and the wider Arab world into clear, plain-English explainers.

More analysis by Ahmer Bilal
Scroll to Top