In brief
Green hydrogen is hydrogen made by splitting water with renewable electricity. Gulf states want to export it, usually as ammonia, because they have cheap solar and wind, ports and energy-industry skills. The first large plant, at NEOM in Saudi Arabia, is more than 90% built and now expected to start in mid-2027, a year later than first planned. Buyers, prices and technology remain unproven at scale.
What is green hydrogen, and how does it differ from other types?
Hydrogen is a gas that burns without emitting carbon dioxide, and it is used today mainly in refining and fertiliser production. Almost all of it is made from natural gas or coal, which emits carbon. The industry uses colours as shorthand.
| Type | How it is made | Typical cost (US$ per kg, recent estimates) |
|---|---|---|
| Grey | Natural gas, emissions released | About 1 to 2, depending on gas price |
| Blue | Natural gas with carbon capture and storage | About 1.5 to 3 |
| Green | Electrolysis of water with renewable power | About 4 to 6 in most projects today, lower targets for later |
Source: IEA, Global Hydrogen Review 2023 to 2025; IRENA, Geopolitics of the Energy Transformation: The Hydrogen Factor, 2022. Ranges vary by site and year.
The cost ranges show why green hydrogen needs either subsidies, carbon pricing or very cheap electricity to compete. The Gulf’s pitch rests on the last of these. As explained in the article on the Gulf solar boom, the region has some of the lowest solar prices in the world.
Why are Gulf states interested?
There are four reasons, and they are mostly economic.
- Cheap renewable electricity is the main cost of making green hydrogen.
- Established ports, pipelines and chemical industries can ship and handle ammonia, which is easier to transport than hydrogen.
- Governments need new export products as oil demand is expected to peak in some scenarios.
- Large buyers in Japan, South Korea and Europe have announced they will need low-carbon fuels.
Saudi Arabia, the UAE and Oman have all published national hydrogen strategies. The UAE’s strategy, approved in July 2023, targets 1.4 million tonnes a year by 2031 (1 million green and 0.4 million blue), rising to 7.5 million by 2040 and 15 million by 2050. Oman’s Hydrom programme, through its first two auction rounds, covers about 1.38 million tonnes a year by 2030, which would need more than $49 billion of investment.
What projects actually exist?
The flagship is the NEOM Green Hydrogen Company in north-west Saudi Arabia, owned in equal parts by NEOM, ACWA Power and Air Products. The project, valued at around $8.4 billion when financing closed in 2023, includes about $6.1 billion of non-recourse project debt. It plans about 2.2 gigawatts of solar and wind power and electrolysers to produce up to 600 tonnes of hydrogen per day, converted to up to 1.2 million tonnes of ammonia per year. Air Products holds a 30-year agreement to buy the output and transport it to Europe. Production was first targeted for 2026, but in late 2025 and early 2026 Air Products said the project was more than 90% complete, with the power plant more than 95% complete, and expected production to begin around mid-2027. Air Products has also agreed with Yara to market ammonia that it does not convert to hydrogen itself, which hints at uncertainty about demand for the molecule in Europe.
| Project or plan | Country | Scale | Status (as of late 2026) |
|---|---|---|---|
| NEOM Green Hydrogen Company | Saudi Arabia | Up to 600 tonnes of hydrogen a day; 1.2 million tonnes of ammonia a year | More than 90% built; production expected around mid-2027 |
| HyDuqm (Hydrom, Engie, Posco) | Oman | About $6.7 billion | Cancelled, December 2025 |
| Hydrom auction rounds 1 and 2 | Oman | About 1.38 million tonnes a year by 2030 | Seven of nine tendered projects progressing; no final investment decision on the first by end-2025 |
| National Hydrogen Strategy | UAE | 1.4 million tonnes a year by 2031 | Approved July 2023; two “hydrogen oases” planned by 2031 |
| Blue ammonia demonstration | Saudi Arabia | One cargo to Japan | Shipped September 2020 |
Source: Air Products filings, 2025 and 2026; MEED and Hydrom statements; UAE Government, National Hydrogen Strategy, 2023; Saudi Aramco, 2020.
Oman has run competitive rounds for land blocks through its state company Hydrom, attracting international developers. But in December 2025 Hydrom, Engie and Posco cancelled the $6.7 billion HyDuqm project, citing an assessment of global offtake and investment conditions, and a BP project in Oman was also dropped. Hydrom said only seven of the nine original projects were still progressing. Egypt is courting investors in the Suez Canal Economic Zone, which has the advantage of shipping access. The UAE’s Masdar has pilot plants and has agreed a series of projects. Saudi Aramco, meanwhile, has focused on blue hydrogen and blue ammonia and sent a demonstration shipment of blue ammonia to Japan in 2020.
What are the hard numbers, and the hard problems?
Cost and demand
Making a kilogram of green hydrogen takes about 50 to 55 kilowatt-hours of electricity, plus water, so power cost dominates. Electrolyser prices have not fallen as fast as solar panel prices. On the demand side, buyers have been slow to sign binding long-term purchase contracts at the prices producers need. The IEA’s Global Hydrogen Review 2025 found that announced projects could produce 37 million tonnes a year of low-emissions hydrogen by 2030, but only about 4.2 million tonnes are operational, under construction or at final investment decision. Export-oriented projects are less likely to reach that stage: only about 5% have done so. In June 2026 Air Products also said it would not proceed with its Louisiana clean hydrogen complex.
Water
Electrolysis needs about nine litres of water per kilogram of hydrogen in theory and more in practice. In the Gulf this means desalinated seawater. The volume is small compared with agriculture or cities, but the process is energy-intensive and, as covered in the guide to desalination in the Gulf, brine discharge is an environmental concern.
Transport and conversion
Turning hydrogen into ammonia, shipping it, and then converting it back to hydrogen at the destination all lose energy and add cost. For many uses, such as fertiliser, ammonia can be used directly. For others, the conversion costs eat into the savings.
Is it hype?
Enthusiasts argue that hydrogen will be essential for steel, shipping, aviation and fertiliser, where batteries and electricity do not work easily, and that the Gulf is one of the lowest-cost places to make it. Sceptics respond that most announced projects have no committed buyer, that subsidies in the United States and Europe pull production elsewhere, and that direct electrification is cheaper in most applications. Both sets of claims are supported by evidence, which is why a cautious reading is sensible: the first projects will be proof of concept, and the market is likely to be smaller and slower than the 2021 forecasts suggested.
There is also the question of what “low-carbon” means. Blue hydrogen from Gulf gas can be cheaper in the near term, but it depends on how much methane leaks and how much carbon capture really retains. Standards on this are still being written in the EU, Japan and elsewhere. For a wider view of how the Gulf handles energy security and global demand, see the article on energy security in a changing world.
Our analysis: the real constraint is the buyer, not the sun
Coverage of Gulf hydrogen usually starts from the supply side, where the region’s advantages are real. The data suggest that supply is not the binding constraint. NEOM’s solar and wind plant is more than 95% built, and its financing closed in 2023. What remains uncertain is who pays enough to cover costs of $4 to $6 a kilogram when grey hydrogen costs $1 to $2.
Comparing countries makes this clear. The UAE’s strategy leans toward a mix of green and blue hydrogen and aims to meet local demand of about 2.7 million tonnes by 2031, which reduces its dependence on export buyers. Saudi Arabia’s flagship has a single committed offtaker, Air Products, which bears the market risk and has itself retreated from other projects. Oman has the largest announced pipeline and the most export-dependent model, and it is the one that has just lost two projects, in line with the IEA’s finding that export projects struggle to reach investment.
The implication is that domestic demand, such as ammonia for fertiliser, steel and refining, is a safer base than shipping to Europe or Japan, where subsidy schemes and carbon rules are still shifting. Projects that serve a local customer first and export the surplus have a better chance of surviving a slow market. The Gulf is likely to produce some green hydrogen, but the scale of its 2030 targets looks more like an option than a forecast.
What to watch
The most useful indicators are concrete: whether NEOM reaches steady output in 2027, whether buyers in Japan, South Korea or Germany sign long-term contracts at prices that cover costs, and how many of the Omani and Egyptian blocks reach final investment decision. Announced capacity, by itself, tells you little. Until volumes are delivered, treat the region’s hydrogen ambitions as an option on the future, not an existing industry.
- International Energy Agency, Global Hydrogen Review 2025, December 2025, and earlier editions 2023 and 2024
- International Renewable Energy Agency (IRENA), Geopolitics of the Energy Transformation: The Hydrogen Factor, 2022
- Air Products, Form 10-K and 10-Q filings for fiscal 2026 and announcement on ammonia agreement with Yara, December 2025
- NEOM Green Hydrogen Company, Air Products and ACWA Power, financial close announcement, May 2023
- Hydrom (Oman), hydrogen development programme round announcements, 2022 to 2025, and MEED reporting on the HyDuqm cancellation, December 2025
- UAE Government, National Hydrogen Strategy, approved July 2023 (u.ae)
- Saudi Aramco, blue ammonia shipment announcement, September 2020