In brief
Gulf states are building data centres because they have cheap energy, available land and governments that want computing power kept inside national borders. The difficulty is heat: cooling servers in a desert is expensive and can use a lot of power and water. The 2026 Iran war added a second problem, because Iranian drones damaged cloud facilities in the UAE and Bahrain.
Why build data centres in the Gulf?
A data centre is a building full of servers that store and process information, and the AI boom has made them far larger and hungrier for electricity. Three Gulf advantages explain the rush of announcements.
Power is the first. Gulf states produce electricity from gas and, increasingly, from solar and nuclear plants, often at lower cost than in Europe. The UAE’s Barakah plant, with four reactors and about 5.6 gigawatts of capacity, was fully operating by 2024 and supplies roughly a quarter of the country’s electricity, according to its operator. The Al Dhafra solar plant, about 2 gigawatts, came online in 2023 (see the Gulf’s solar boom).
Land and capital are the second and third. Large sites are available, and state-linked investors can fund projects that would be hard for private firms to finance alone. The location also sits between Europe, Africa and South Asia, which helps with network latency for customers across those regions.
How big are the projects?
The largest announced project is Stargate UAE. In May 2025 the UAE and the United States announced a planned AI campus in Abu Dhabi of up to 5 gigawatts, with a first 1 gigawatt computing cluster developed by G42 with partners including OpenAI, Oracle, Nvidia, Cisco and SoftBank. The first 200 megawatts were expected to come into service in 2026. For scale, 1 gigawatt is roughly the output of a large power station and is more than most existing data centre campuses use.
Saudi Arabia’s HUMAIN, owned by the Public Investment Fund, has announced targets that differ by source and date, from about 1.9 gigawatts by 2030 to 3 gigawatts by 2030 and more than 6 gigawatts by 2034, with tenders reported for a 6-gigawatt campus east of Riyadh. Microsoft has committed $15.2 billion in the UAE for 2023 to 2029, including a $1.5 billion stake in G42, according to Microsoft’s announcements. These figures are targets announced by companies and governments. Delivery depends on chip supply, grid connections and construction schedules, so timelines may slip.
| Indicator | Figure | Year and source |
|---|---|---|
| Live data centre capacity, Gulf region | About 1.6 GW | JLL estimate, cited by Reuters, 2025 |
| Under construction | About 2.6 GW | JLL estimate, cited by Reuters, 2025 |
| Planned pipeline | About 13.8 GW | JLL estimate, cited by Reuters, 2025 |
| Forecast growth to 2030 | Nearly triple | S&P Global, 2025 to 2026 |
| UAE capacity run by one operator (Khazna, part of G42) | Nearly three-quarters | Industry reports, 2025 |
| Saudi national target | 6.9 GW by 2034 | Saudi government and press reports, 2025 |
Source: JLL via Reuters, 2025; S&P Global Commodity Insights, 2025 to 2026; AGBI and company announcements, 2025. Estimates differ widely between consultancies, so treat the gap between live and planned capacity as the main point.
What is a sovereign cloud?
A sovereign cloud is cloud computing where data, and often the staff and keys that control it, stay under the law of one country. Governments want this for health records, financial data and state systems.
The rules differ by country. The UAE’s 2019 federal law on information technology in health restricts moving patient data abroad except in defined cases. Saudi Arabia’s Personal Data Protection Law, in force from 2023 with a grace period for compliance, limits transfers of personal data outside the kingdom, and its National Cybersecurity Authority sets cloud security controls for government and critical sectors. Regulations like these push cloud providers to build local regions or to partner with local firms.
| Provider region | Location | Launched (about) |
|---|---|---|
| AWS Middle East | Bahrain | 2019 |
| Microsoft Azure UAE North and Central | Dubai and Abu Dhabi | 2019 |
| AWS Middle East (UAE) | UAE | 2022 |
| Microsoft Azure Qatar Central | Doha | 2022 |
| Google Cloud Doha | Qatar | 2023 |
| Google Cloud Dammam | Saudi Arabia | 2023 |
Source: provider announcements, 2019 to 2023. Microsoft said its Saudi Arabia East region would open to customers in November 2026; check each provider for current availability.
How do you cool a data centre at 45 degrees Celsius?
Servers turn almost all the electricity they use into heat, and that heat has to be removed. In temperate climates, operators can use outside air for much of the year. Along the Gulf coast, summer temperatures often pass 45 degrees Celsius with high humidity, so facilities rely on mechanical chillers, which use more power.
The industry measures efficiency with power usage effectiveness (PUE), the ratio of total facility energy to the energy used by the computing equipment alone. A PUE of 1.0 would mean no overhead. Cooling can account for a large share of overhead, and hot climates push the number up. Operators respond with several methods:
- Liquid cooling, which pipes coolant to the chips and is now standard for dense AI servers.
- Seawater or district cooling, which the Gulf already uses at scale for buildings.
- Siting buildings near solar or nuclear supply so the extra load is met by low-carbon power.
- Running the hottest workloads at night or shifting them to cooler regions when possible.
The wider challenge of living with the heat is covered in extreme heat in Gulf cities.
What about water?
Many data centres use water for cooling. The Gulf has almost no natural fresh water, so supply comes from desalination, which is energy-intensive and discharges brine into the sea (see desalination and water security). Developers say closed-loop and air-cooled designs reduce the water drawn, though they may use more electricity instead. There is a trade-off between energy and water, and there are few public figures that let outsiders check each project. Environmental groups and some researchers have asked for more disclosure.
What did the 2026 Iran war do to Gulf data centres?
The war with Iran which started on 28 February 2026 turned data centres into targets. On 1 March, Iranian drones struck two Amazon Web Services facilities in the UAE and damaged a third in Bahrain, according to AWS and press reports, and Iran’s Revolutionary Guards said they chose them because of links to US military systems. Outages disrupted banking, payments and ride-hailing across the Gulf for more than a day. On 15 September 2026, AWS said it still could not restore service to some facilities in Bahrain and the UAE and that it had “exhausted every option” for some data hosted in Bahrain, as reported by CNBC.
Iran also named US technology firms as targets, and Iranian officials have threatened cables and data centres if fighting resumes. Analysts differ on the lesson. The Middle East Institute argues that the system held up, since only three of about 233 Gulf data centres were affected. Reports citing Reuters say the UAE is considering splitting its planned 5-gigawatt campus into smaller, hardened sites, while the Stargate UAE consortium says construction continues. These accounts are not fully consistent, and officials have not published a damage assessment.
Our analysis: the Gulf’s advantage and its weak point are the same thing
The Gulf case rests on concentration: cheap energy, large state-backed sites and a few dominant operators allow projects of a size that would take years to approve in Europe. Concentration is also the exposure. The 2026 strikes showed that a small number of availability zones can carry banking, payments and government services for a whole region, and that physical security is now part of a cloud region’s design.
Comparing countries helps. The UAE has the most capacity and the most foreign hyperscaler regions, but also the highest profile as a target and the heaviest dependence on US chip licences. Saudi Arabia has the largest planned numbers and the biggest domestic market for sovereign cloud, but the least capacity actually running. Qatar and Bahrain are smaller; Bahrain’s role as an early AWS region made it an early casualty. These differences suggest that the winners will be those that combine capacity with redundancy, meaning several sites, backup power and cross-border failover.
There is also a trade-off between sovereignty and resilience. Rules that keep data on local soil make it harder to fail over to a region in another country. Governments will have to decide whether to loosen those rules for continuity, or pay for more local duplicates. The cost of the second option is large, and it is paid in electricity and in water, which returns the discussion to the cooling problem above.
Who benefits, and who bears the cost?
Supporters point to construction jobs, new technical skills and a base for local AI firms. Data centres themselves employ few people once built, so the long-term gains depend on the companies that use the capacity. Critics ask whether a region with low electricity prices, often subsidised, should devote so much power to a single industry, and whether tariffs reflect the real cost. Governments reply that AI infrastructure is a strategic asset in the same way that ports and refineries were in earlier decades.
What to watch
Watch how much capacity is actually energised in 2026 and 2027, since announcements run well ahead of construction. Watch whether operators publish PUE and water figures, and whether the UAE and Saudi Arabia add backup sites. And watch the chip licences that decide whether the buildings can be filled with the latest processors. These links to national strategy are explored further in the Gulf’s AI ambitions.
- White House and UAE government, announcements on US-UAE AI Acceleration Partnership and the 5GW AI campus (May 2025)
- Emirates Nuclear Energy Corporation, Barakah Nuclear Energy Plant, operations updates (2024)
- Saudi Data and AI Authority (SDAIA), Personal Data Protection Law and implementing regulations (2023)
- UAE Federal Law No. 2 of 2019 on the Use of ICT in Health Fields
- Saudi National Cybersecurity Authority, Cloud Cybersecurity Controls (2020)
- JLL estimates of Gulf data centre capacity, as cited by Reuters (2025); S&P Global Commodity Insights, Gulf data centre capacity forecast (2025)
- AGBI, "What's happening with data centres in the Gulf?", October 2025
- CNBC, "AWS says it can't restore service to Bahrain, UAE facilities 6 months after Iran strikes", 15 September 2026; Middle East Institute, Gulf AI and the 2026 war (2026)
- Uptime Institute, Global Data Center Survey (annual), on power usage effectiveness